Major Projects
Installation site | Shin-Hikida Substation |
---|---|
Introduction | March 2006 |
Main purpose | Compensation of voltage dropping |
Line voltage | DC 1,500V |
System capacity | 1,080kW |
Installation site | Kami-Fukuoka Track Sectioning Cabin |
---|---|
Introduction | August 2012 |
Main purpose | Compensation of voltage dropping |
Line voltage | DC 1,500V |
System capacity | 1,800kW |
Installation site | Sakurajimasanbashi-dori Station and Nakasu-dori Station |
---|---|
Introduction | April 2007 |
Main purpose | Compensation of voltage dropping |
Line voltage | DC 600V |
System capacity | 250kW |